Construction of the 10.1-km Avinashi Road elevated corridor between Uppilipalayam and Goldwins began in December 2020, at an estimated cost of ₹1,621.30 crore. Velumani, then Municipal Administration Minister, launched the construction.
A / 04
Avinashi Road Elevated Corridor
Construction of the 10.1-km, ₹1,621.30-crore corridor from Uppilipalayam to Goldwins began in 2020.